Serving Stafford, Fredericksburg
and Surrounding Counties Since 2003
Cabinet Design • Cabinet Installation • Bathroom Cabinets
Wet Bars/Kitchenettes • Home Office • Entertainment Unit • Island Add Ons
Laundry Cabinets • Countertops • Basic Appliance Installation • Basic Plumbing
Basic Electrical • Windows & Installation • Exterior Doors & Installation
Getting Started
Choose Your Wood Type: Cherry, Maple, Painted Maple, Hickory Or Oak
Choose Whether You Will Be Replacing Your Appliances: Size Of Appliances May Determine Size Of Cabinets or Kitchen Layout.
Choose Your Contractor: Taylor Made Kitchens Can Provide Cabinet Installation Or Work With Your Contractor
Decide Whether You Will Be Replacing Your Floors: Flooring Material Will Determine Whether It Should Be Done Before Or After Cabinet Installation.
Choose Construction Grade: Plywood Sides vs All Wood Case (Sides, Floor, Back & Shelving), A 10% Upgrade*, Soft Close Feature On Doors & Drawers
*Standard With Waypoint
Decide What Your Must Haves Are:
What Upgrades You Want: Upgrades Are Great For Function and Will Add To The Cost But Is Money Well Spent If Budget Allows
*Roll Outs, Inserts, Finished Interior, Glass Doors
What’s Popular?
Waypoint
Maple Painted Linen In Flat Panel Door Style Or Hazelnut Glaze In Raised Panel Door Style
Cherry Chocolate Glaze Or Bordeaux, Maple Auburn Glaze Or Mocha Glaze
Haas
Maple Painted White In Flat Panel Door Style Or Black Aged With Highlights, Painted Gray In Any Door Style
Standard Unique Finish Maple Barnwood, Maple Ginger, Maple Cabernet
Cherry Cabernet, Cherry Spice, Cherry Autumn, Cherry Cinnamon
Standard Overlay vs Full Overlay
Standard Overlay is the traditional style where you can see the frame of the cabinet
Full Overlay is popular where entire frame of the cabinet is not visible due to larger doors
How Long Should You Expect To Be Without A Kitchen?
For a standard removal and installation of cabinets, About a week and a half.
Removal and Basic Installation takes a two to three days.
Most countertops are templated only once base cabinets are set.
Countertop is installed approximately a week later.
Flooring and Lighting may add around an additional week without a kitchen.
*For an additional cost a contractor can set up a temporary sink hook up in your kitchen but arrangements usually need to be made beforehand as most are set up using existing sink base.